ok5315041@gmail.comok5315041@gmail.com +86 132 1544 4447+86 132 1544 4447 Mon–Sat 8:30–18:00 (GMT+8)周一至周六 8:30–18:00(GMT+8)

Steel Buildings in Vietnam越南钢结构建筑

Vietnam's industrial parks — Bac Ninh, Hai Phong, Binh Duong, Dong Nai — keep absorbing manufacturing that used to sit elsewhere. That means workshops with crane beams, tall warehouses and staff buildings, all needing to go up quickly and survive a wet, sometimes typhoon-grade climate.北宁、海防、平阳、同奈的工业园区,持续承接从别处转移过来的制造业。这带来的是带吊车梁的车间、高净高仓库和员工用房——既要建得快,也要扛得住潮湿、局部台风级别的气候。

Market snapshot市场概况

What buyers here are building当地买家在做什么

Buyers here are often factory owners expanding a line, or contractors building for a tenant who has already signed a lease. Both care about the same three things: the crane and power requirements being built in, a schedule that matches the tenant's move-in date, and cladding that does not leak in the monsoon.这里的买家多是扩产的厂主,或为已签约租户施工的承包商。他们关心的都是三件事:吊车与电力预埋有没有做到位、工期能不能对上租户进场日期、围护在雨季会不会漏水。

Workshop with crane beams带吊车梁的车间

5–50 t overhead cranes, built-up columns sized for the wheel loads, crane runway beams and rails supplied with the frame.5–50 吨桥式吊车,格构柱按轮压设计,吊车梁与轨道随主体一起供货。

Warehouse & distribution仓库与配送中心

24–40 m clear span, dock levellers optional, roof designed for future solar loading if you plan PV.24–40 米无柱跨度,可选月台调节板;若计划装光伏,屋面预留荷载。

Dormitory & office宿舍与办公楼

Three to five storeys of light steel frame with composite slabs, delivered as a kit including stairs and balconies.三到五层轻钢框架配组合楼板,整栋成套供货,含楼梯与阳台。

Design conditions设计条件

Engineered for the local climate and code按当地气候与规范设计

Design wind设计风荷载Northern and central provinces sit in the typhoon path — we design to the basic wind speed on your drawings, commonly 180–250 km/h there, and increase cladding fixing density at eaves and corners.北部与中部省份处于台风路径上——按你图纸上的基本风速设计,当地常见 180–250 公里/小时;檐口与角部加密板件固定。
Humidity & rain湿度与降雨Monsoon rainfall and year-round humidity call for ventilated roof build-ups, sealed laps and drainage that does not rely on a single downpipe.雨季降雨加上全年高湿,需要通风屋面构造、密封搭接,排水不能只靠单根落水管。
Seismic抗震Low to moderate seismicity. Standard braced frames are usually sufficient; we still check against the parameters on your drawings.地震活动较低至中等,常规支撑框架通常足够;仍会按你图纸上的参数校核。
Corrosion防腐C3–C4 inland, higher within a few kilometres of the coast. We specify coating thickness and galvanizing according to the site, not one default for the whole country.内陆 C3–C4,距海岸数公里内要求更高。涂层厚度与镀锌按具体厂址确定,而不是全国一个默认值。
Roof & wall屋面与墙面Single-skin sheet with insulation blanket for factories; sandwich panel for clean or temperature-controlled areas.车间多用单层板加保温棉;洁净或控温区域用夹芯板。
Shipping & delivery运输与交付

Getting the building to Vietnam把货顺利送到越南

Ports港口Hai Phong in the north, Cat Lai / Ho Chi Minh City in the south, Da Nang in the centre. Small structures can also move by road via the Pingxiang–Hanoi border crossing.北部海防港,南部吉莱/胡志明港,中部岘港。小体量结构也可经凭祥—河内口岸陆运。
Packing包装Steel bundles strapped and marked per truck load, since many sites need road delivery inland after the container.钢构件按整车装载分组捆扎并编号,因为很多工地集港后还要内陆汽运。
Documents单据Proforma invoice, packing list, B/L, mill test certificates, certificate of origin (Form E available for ACFTA).形式发票、装箱单、提单、材质报告、原产地证(中国—东盟自贸区可出 FORM E)。
Payment付款30% T/T deposit, 70% before shipment.30% 电汇定金,发货前付清 70%。
Lead time交期30 days after drawing approval; the schedule is confirmed in your quotation.图纸确认后 30 天出厂,具体排产以报价单为准。
FAQ常见问题

Questions from buyers in Vietnam来自越南买家的问题

Can you match the crane we already bought?能配合我们已经买好的吊车吗?
Yes. Send the crane datasheet — wheel base, wheel load, hook height and duty class — and we size the runway beam and bracket to it.可以。把吊车参数表发来——轮距、轮压、起升高度和工作级别——我们据此确定吊车梁与牛腿。
Do you supply to industrial park tenants directly?能直接供工业园区的租户吗?
We supply owners, tenants and contractors alike. For tenants we can work to the landlord's drawing standards and issue documents the park management needs for approval.业主、租户、承包商我们都供。租户项目可以按园区业主的制图标准出图,并提供园区审批需要的资料。
How is the building delivered on site?现场怎么交货?
Containers or flat racks to the port, then by truck to site. Every bundle is marked to the erection drawing so your crew can unload in the right order.集装箱或框架柜到港,再汽运到工地。每捆都按吊装图编号,你的队伍可以按顺序卸货。
Keep reading延伸阅读

Next steps下一步

Steel building cost guide钢结构造价指南

Read more查看详情

How to order — 8 steps采购流程八个步骤

Read more查看详情

Get a quotation获取报价

Read more查看详情

Other markets we serve:其他市场: Philippines菲律宾 · Cambodia柬埔寨

Send Your Size, Get a Price给我尺寸,给你价格

Tell us the width, length, location and what the building is for — an itemised quotation follows within 48 hours.告诉我们宽度、长度、项目所在地和用途,48 小时内提供分项报价单。

Request a Quote获取报价