Around twenty typhoons cross the Philippines every year, and the structural code reflects it: basic wind speeds up to 250 km/h in the most exposed zones. A steel building here is only as good as its cladding fixings, its anchor bolts and the load path that connects them.菲律宾每年约有二十个台风过境,规范也如实反映了这一点:最不利风区的基本风速可达 250 公里/小时。在这里,钢建筑的好坏取决于板件固定、地脚螺栓,以及把它们连起来的传力路径。
Buyers range from PEZA-registered manufacturers to provincial distributors. Almost all of them have seen a roof peel off in a storm, so a supplier who can explain fixing patterns and load paths wins trust faster than one who only quotes a price per square metre.买家从 PEZA 注册制造商到省级分销商都有。几乎所有人都见过风暴掀屋顶,所以能把固定方式与传力路径讲清楚的供应商,比只报每平米价格的更容易赢得信任。
24–36 m clear spans, dock openings and typhoon-rated cladding with a continuous tie-down path.24–36 米无柱跨度,月台门洞,抗台风围护并形成连续抗风拉结。
Crane beams, mezzanines and high-level ventilation for PEZA locators and food processing.吊车梁、夹层与高位通风,服务 PEZA 区内企业与食品加工。
Three to five storeys of light steel frame with composite slabs, suited to tight sites and fast handover.三到五层轻钢框架配组合楼板,适合场地紧张、交付期短的项目。
| Design wind设计风荷载 | Designed to the NSCP wind zone on your drawings — up to 250 km/h basic wind speed in Zone I. Fixing density is increased at eaves, corners and ridges where uplift concentrates.按你图纸上的 NSCP 风区设计——I 区基本风速可达 250 公里/小时。在风吸力集中的檐口、角部与屋脊加密固定。 |
|---|---|
| Seismic抗震 | High seismicity. Frames and connections are detailed for the parameters your engineer supplies, with ductile detailing rather than strength alone.高地震活动区。框架与节点按你方工程师提供的参数深化,采用延性做法,而不只满足强度。 |
| Corrosion防腐 | Island humidity and salt air — galvanized primary members and stainless or HDG fasteners as standard, with cut edges treated.岛屿湿度与盐雾——主构件镀锌,紧固件用不锈钢或热镀锌,切口做防腐处理。 |
| Rain降雨 | 2,000–4,000 mm plus typhoon rainfall intensity. Gutters, downpipes and overflow scuppers sized for intensity, not annual averages.年降雨 2,000–4,000 毫米,另有台风强降雨。天沟、落水管与溢流口按降雨强度而非年均值计算。 |
| Heat & humidity高温与湿度 | Ventilated roof build-ups and insulation to keep the working floor usable and reduce condensation on the underside of the sheet.通风屋面构造加保温,保证车间可用并减少板底结露。 |
| Ports港口 | Manila (North and South Harbor), Subic, Cebu and Davao.马尼拉(北港/南港)、苏比克、宿务、达沃。 |
|---|---|
| Packing包装 | Bundles marked per erection drawing, with lifting points and weights shown; container plan issued before loading.按吊装图编号捆扎,标注吊点与重量;装柜前提供装箱方案。 |
| Documents单据 | Proforma invoice, packing list, B/L, mill test certificates, certificate of origin (Form E available for ACFTA).形式发票、装箱单、提单、材质报告、原产地证(中国—东盟自贸可出 FORM E)。 |
| Payment付款 | 30% T/T deposit, 70% before shipment.30% 电汇定金,发货前付清 70%。 |
| Lead time交期 | 30 days after drawing approval; typhoon-season delivery can be scheduled to land after the peak if you prefer.图纸确认后 30 天出厂;如需避开台风季,可安排错峰到港。 |
Other markets we serve:其他市场: Vietnam越南 · Cambodia柬埔寨
Tell us the width, length, location and what the building is for — an itemised quotation follows within 48 hours.告诉我们宽度、长度、项目所在地和用途,48 小时内提供分项报价单。