Cambodia's growth is concentrated along a few corridors — Phnom Penh's outskirts, the Sihanoukville special economic zone and the roads between them. Garment and footwear factories, tyre plants and logistics sheds are going up on short schedules, and steel is how that speed is achieved.柬埔寨的增长集中在几条走廊上——金边郊区、西哈努克经济特区,以及连接两者的公路沿线。制衣制鞋厂、轮胎厂和物流仓库都在按很紧的工期建设,而钢结构正是实现这种速度的方式。
Most projects are tenant-driven: an investor signs a lease and the building has to be ready for equipment installation. That makes drawing approval speed and shipping certainty more important than a marginal price difference.这里的项目多是租户驱动的:投资方签下租约,建筑必须赶在设备进场前完工。因此图纸确认速度和船期确定性,比每平方米差一两美金更重要。
Long-span production halls with mezzanines for offices, high-level windows for daylight, and roofs sized for future solar.大跨度生产车间,办公夹层,高位窗采光,屋面预留光伏荷载。
20–36 m spans, dock openings, generous truck aprons and simple expansion for phased building.20–36 米跨度,月台门洞,宽阔回车场地,可分期扩建。
Three to four storeys of light steel frame with composite slabs, balconies and shared sanitary cores.三到四层轻钢框架配组合楼板,含阳台与集中卫浴。
| Design wind设计风荷载 | Cambodia is largely outside the main typhoon track, but monsoon squalls still govern cladding. Wind speed is taken from your drawings and uplift checked at edges.柬埔寨基本不在主台风路径上,但季风强对流仍控制围护设计。风速取自你方图纸,边角部位校核风吸力。 |
|---|---|
| Rain & drainage降雨与排水 | 1,500–2,000 mm concentrated in the wet season. Roof slope, gutter capacity and downpipe count are set for that intensity.年降雨 1,500–2,000 毫米且集中在雨季。屋面坡度、天沟容量与落水管数量按该强度确定。 |
| Heat隔热 | Heat gain, not cold, is the issue. Ventilated roofs, insulation blankets or sandwich panels keep the working floor bearable.这里的敌人是热量而非寒冷。通风屋面、保温棉或夹芯板能让车间温度可接受。 |
| Seismic抗震 | Low seismicity — standard braced frames with the parameters from your drawings.地震活动低——常规支撑框架,参数按你方图纸。 |
| Corrosion防腐 | Inland C2–C3; Sihanoukville and coastal sites need galvanized members and better fasteners.内陆 C2–C3;西哈努克等沿海场地需镀锌构件与更高等级紧固件。 |
| Ports港口 | Sihanoukville (deep-sea container terminal); Phnom Penh dry port for inland delivery via Ho Chi Minh City.西哈努克(深水集装箱码头);金边内陆港可经胡志明市中转。 |
|---|---|
| Packing包装 | Container loading plan per building bay, so site erection follows the truck arrival order.按建筑轴线制定装柜方案,让现场吊装顺序与到货顺序一致。 |
| Documents单据 | Proforma invoice, packing list, B/L, mill test certificates, certificate of origin (Form E available for ACFTA).形式发票、装箱单、提单、材质报告、原产地证(中柬自贸可出 FORM E)。 |
| Payment付款 | 30% T/T deposit, 70% before shipment.30% 电汇定金,发货前付清 70%。 |
| Lead time交期 | 30 days after drawing approval; phased deliveries can be scheduled to match your construction sequence.图纸确认后 30 天出厂;可分批交货以配合你的施工节奏。 |
Other markets we serve:其他市场: Vietnam越南 · Philippines菲律宾
Tell us the width, length, location and what the building is for — an itemised quotation follows within 48 hours.告诉我们宽度、长度、项目所在地和用途,48 小时内提供分项报价单。