How to Order a Steel Building from China如何从中国采购钢结构建筑

Eight steps from first message to container on site — with what we do and what you need to provide at each stage. Production takes 30 days after drawings are approved.从第一条消息到集装箱抵达工地,共八个步骤——每一步写清我们做什么、你需要提供什么。图纸确认后生产周期 30 天。

The process流程

Eight steps, no surprises八个步骤,全程透明

Most first-time buyers worry about paying before seeing the goods. This is the exact sequence we follow, and where the money and documents change hands.第一次从中国采购的买家最担心先付款看不到货。下面是我们实际执行的顺序,以及每一步资金和单据如何流转。

01

Inquiry询盘

We do: reply within 24 hours, assign an engineer.
You provide: building use, width, length, site location.
我们:24 小时内回复,指派工程师。
你提供:用途、宽度、长度、项目所在地。

02

Design and estimate方案与估算

We do: structural scheme and steel weight estimate.
You provide: drawings if available, snow and wind loads, crane needs.
我们:结构方案与用钢量估算。
你提供:已有图纸(若有)、雪荷载风荷载、吊车需求。

03

Quotation报价

We do: itemised quotation within 48 hours.
You provide: confirmation of options — insulation, doors, crane.
我们:48 小时内出分项报价单。
你提供:确认配置选项——保温、门窗、吊车。

04

Contract and deposit合同与定金

We do: issue PI or sales contract with full specifications.
You provide: signed contract and 30% T/T deposit.
我们:出具形式发票或销售合同,规格写全。
你提供:签署合同并支付 30% T/T 定金。

05

Shop drawings施工图确认

We do: general arrangement and connection details.
You provide: review and signed approval — this starts the clock.
我们:出总装图与节点详图。
你提供:审核并签字确认,工期从此起算。

06

Production生产

We do: fabricate in 30 days, weekly progress photos by WhatsApp.
You provide: nothing — or book an inspection.
我们:30 天完成生产,每周 WhatsApp 发进度照片。
你提供:无需操作,或安排验货。

07

Inspection验货

We do: in-house QC plus welcome third-party SGS or BV inspection.
You provide: book the inspector or visit the factory.
我们:内部质检,并欢迎 SGS、BV 等第三方验货。
你提供:委托验货机构或来厂参观。

08

Shipping and documents发运与单据

We do: packing, loading photos, B/L, CO, MTC, installation guide.
You provide: 70% balance and either your forwarder or ours.
我们:包装、装柜照片、提单、原产地证、材质单、安装指导。
你提供:70% 尾款,指定货代或用我们的货代。

Timeline时间节点

From deposit to site从定金到工地

1

Day 0第 0 天

Deposit received, contract signed收到定金,合同生效

2

Day 3–5第 3–5 天

Shop drawings issued for approval出具施工图待确认

3

Day 30第 30 天

Production finished, ready for inspection生产完成,可安排验货

4

Loading装柜发运

Balance paid, container loaded and sealed尾款到账后装柜、铅封

5

Sea freight海运

Transit depends on destination — confirmed with each quotation航程取决于目的港,报价时确认船期

Documents单据

What arrives with the shipment随货提供哪些文件

Missing paperwork is the most common reason a container sits at customs. We ship a complete set with every order.单据不齐是集装箱卡在海关最常见的原因,我们每票货都配齐整套文件。

Proforma invoice and commercial invoice形式发票与商业发票For payment and customs valuation用于付款与海关估价
Packing list装箱单Item by item, matched to container numbers逐项列明,与柜号对应
Bill of lading提单Original or telex release, your choice正本或电放,可指定
Certificate of origin原产地证CO, or Form A / Form E where a preferential tariff appliesCO 或 Form A / Form E(适用优惠关税时)
Mill test certificate材质证明Chemical and mechanical properties of the steel钢材化学成分与力学性能
Erection drawings and manual安装图与手册Numbered parts, bolt schedule, step-by-step guide构件编号、螺栓清单、分步安装说明

Payment, warranty and support付款、质保与服务

Payment付款30% T/T deposit, 70% before shipment30% T/T 定金,70% 发货前付清
Warranty质保12 months from delivery交付后 12 个月
Installation support安装支持Numbered drawings, remote video guidance, and on-site supervision on request编号图纸、远程视频指导,可按需派人现场指导
Spare parts备件Extra bolts, screws, sealant and touch-up paint included with every shipment每票随货配带备用螺栓、自攻钉、密封胶与补漆

Questions buyers ask买家常问

Can you send an engineer to install?可以派工程师安装吗?
Yes, on request. We quote supervision separately — flights, visa, accommodation and daily rate — and most clients find local labour plus our remote video guidance is enough.可以,需单独报价(机票、签证、食宿与日薪)。多数客户用当地工人配合我们的远程视频指导即可完成安装。
What happens if I change the drawings after production starts?生产开始后改图纸怎么办?
Changes before fabrication are free. Once steel is cut, we quote the delta and adjust the schedule — which is why step 5 matters more than any other.下料前修改免费;钢材一旦切割,我们按增量报价并顺延工期——这也是第 5 步最关键的原因。
Can I inspect before paying the balance?付尾款前可以验货吗?
Yes. Inspection can be arranged before loading; the 70% balance is due before shipment.可以。装柜前可安排验货,70% 尾款发货前付清。
Can you ship to my port?能发到我的港口吗?
We quote FOB Chinese ports as standard, and CIF to most major ports on request. Tell us the destination and we will compare routes.标准报 FOB 中国港口,可按需报 CIF 至主要港口。告知目的港,我们会比较航线给出方案。

Wondering about the budget?想先了解预算范围?

Standard uninsulated workshops start at USD 35–40 per m² — see the full price guide.无保温标准厂房 35–40 美金/平方米起,详见价格指南。

Steel Building Cost Guide钢结构造价指南

Get a Firm Price for Your Size按您的尺寸获取确定报价

Send the width, length and site location — we return an itemised quotation within 48 hours.告诉我们宽度、长度和项目所在地,48 小时内给出分项报价单。

Request a Quote获取报价