Jamaica sits squarely in the hurricane belt, and that single fact drives every structural decision: wind uplift on the roof, fixing density on the cladding, anchor bolt design, and how the building behaves when a storm strips a neighbouring site. We build warehouses and commercial buildings for that reality.牙买加正处飓风带,这一个事实就决定了所有结构选择:屋面的风吸力、板件的固定密度、地脚螺栓设计,以及风暴掀掉隔壁屋顶时你的建筑会怎样。我们就是按这种工况做仓库和商业建筑的。
Import-dependent, with most goods arriving through Kingston. Buyers are distributors, retailers and light manufacturers who need storage that will still be there after a storm — and who have usually seen what happens to a badly fixed roof.牙买加依赖进口,绝大多数货物经金斯敦港进入。买家是分销商、零售商和轻工制造企业,他们要的仓库必须在风暴过后还立着——而且他们大多亲眼见过固定不到位的屋面会怎样。
Clear span 24–36 m, dock-height openings, wide turning aprons and a roof designed for future solar.24–36 米无柱跨度,月台高度门洞,宽阔回车场地,屋面预留光伏荷载。
Economical single-skin envelope with mechanical fixings rated for uplift, plus ventilated ridge to control heat build-up.经济型单层板围护,机械固定件按抗风吸力选型,屋脊通风降低内部高温。
Single or two-storey steel frame with a rendered or panel facade for roadside showrooms and plazas.单层或两层钢框架,涂料或板材外墙,适合临街展厅与商业广场。
| Design wind设计风荷载 | Hurricane-grade: we design to the basic wind speed on your drawings, commonly 200–250 km/h, with uplift checked at every fixing and a continuous load path from roof sheet to foundation.按飓风工况设计:以你图纸上的基本风速为准,当地多为 200–250 公里/小时;逐点校核风吸力,并保证从屋面板到基础的连续传力路径。 |
|---|---|
| Corrosion防腐 | Salt spray from both coasts. Galvanized primary members, stainless or HDG fasteners, and cut edges treated — this is where cheap buildings fail first.两侧海岸都有盐雾。主构件镀锌、紧固件用不锈钢或热镀锌、切口做防腐处理——廉价建筑最先坏的就是这里。 |
| Seismic抗震 | Low to moderate; standard braced frames with the parameters from your drawings.较低至中等;常规支撑框架,取值按你方图纸。 |
| Rain降雨 | Heavy short-duration storms — gutters and downpipes sized for intensity, not annual total, with overflow scuppers on large roofs.短时强降雨——天沟与落水管按降雨强度而非年总量计算,大屋面另设溢流口。 |
| Roof & wall屋面与墙面 | Concealed-fix or pierce-fix sheet depending on wind zone; sandwich panel where heat gain must be controlled.按风区选暗扣或穿透式固定;有隔热要求时用夹芯板。 |
| Ports港口 | Kingston (main container terminal); Montego Bay for smaller shipments.金斯敦(主要集装箱码头);小批量可走蒙特哥贝。 |
|---|---|
| Packing包装 | Seaworthy bundles with lifting points marked; container plan issued before loading.海运捆扎并标注吊点;装柜前提供装箱方案。 |
| Documents单据 | Proforma invoice, packing list, B/L, mill test certificates, certificate of origin.形式发票、装箱单、提单、材质报告、原产地证。 |
| Payment付款 | 30% T/T deposit, 70% before shipment.30% 电汇定金,发货前付清 70%。 |
| Lead time交期 | 30 days after drawing approval; sailing time is confirmed with your quotation.图纸确认后 30 天出厂,海上航程按报价单确认。 |
Tell us the width, length, location and what the building is for — an itemised quotation follows within 48 hours.告诉我们宽度、长度、项目所在地和用途,48 小时内提供分项报价单。