Colombian logistics has been rebuilding itself around e-commerce: fulfilment centres near Bogotá, distribution parks along the Magdalena corridor, and cold chain investment for a growing export sector. All of it sits on high seismic demand and heavy tropical rainfall.哥伦比亚的物流业正围绕电商重建:波哥大周边的履约中心、马格达莱纳走廊沿线的配送园区,以及为出口增长配套的冷链投资。而这一切都建立在髙抗震要求和强热带降雨之上。
Local engineering practice is rigorous and the seismic review is taken seriously, so the shop drawing package has to be complete and legible. Buyers also expect spare parts and bolt lists to match what was approved — no substitutions on site.当地工程实践严格,抗震审查是当真的,因此加工图必须完整、清楚。买家还要求备件与螺栓清单和审批版本完全一致——现场不允许随意替换。
High-bay racking loads, mezzanine modules, dock banks and a roof designed around sprinkler and PV loads.高位货架荷载、夹层模块、成组月台,屋面按喷淋与光伏荷载设计。
24–36 m spans, cross-dock layouts, and expansion joints so the building can grow with the network.24–36 米跨度,越库布局,设伸缩缝以适应网络扩张。
Insulated envelope, sealed penetrations and refrigerated dock design for perishables and pharmaceuticals.保温围护、密封穿墙节点与冷藏月台设计,服务生鲜与医药。
| Seismic抗震 | High demand under NSR-10. We design to the parameters your engineer supplies, detail connections for ductility and issue calculations for review.按 NSR-10 抗震要求较高。我们按你方工程师提供的参数设计,节点按延性深化,并出具计算书供审核。 |
|---|---|
| Rain降雨 | 2,000–4,000 mm in the Andean and Pacific regions — roof slopes, gutter sizing and flashing set for the wet season.安第斯与太平洋区域年降雨 2,000–4,000 毫米——屋面坡度、天沟与收边按雨季工况确定。 |
| Design wind设计风荷载 | Caribbean-coast sites see tropical storms; inland sites are governed by local gusts. Wind speed always comes from your drawings.加勒比沿岸受热带风暴影响;内陆由局地阵风控制。风速一律取自你方图纸。 |
| Corrosion防腐 | Coastal Caribbean sites need galvanizing; Bogotá's highland climate is comparatively mild.加勒比沿海需镀锌;波哥大高原气候相对温和。 |
| Roof & wall屋面与墙面 | Sandwich panel for cold chain and offices; concealed-fix sheet over purlins for dry storage.冷库与办公用夹芯板;干燥仓储用檩条上暗扣板。 |
| Ports港口 | Cartagena and Barranquilla on the Caribbean, Buenaventura on the Pacific.加勒比侧卡塔赫纳与巴兰基亚,太平洋侧布埃纳文图拉。 |
|---|---|
| Packing包装 | Bundles marked per erection drawing; loading plan issued with the shipping documents so customs and site both work from the same list.按吊装图编号捆扎;装箱方案随货运单据一并提供,报关与现场用同一份清单。 |
| Documents单据 | Proforma invoice, packing list, B/L, mill test certificates, certificate of origin.形式发票、装箱单、提单、材质报告、原产地证。 |
| Payment付款 | 30% T/T deposit, 70% before shipment.30% 电汇定金,发货前付清 70%。 |
| Lead time交期 | 30 days after drawing approval; phased delivery available for multi-building parks.图纸确认后 30 天出厂;多栋园区项目可分批交付。 |
Tell us the width, length, location and what the building is for — an itemised quotation follows within 48 hours.告诉我们宽度、长度、项目所在地和用途,48 小时内提供分项报价单。